Framing Day 3 (9-1-10)

On to day 3 of framing, they started working on the main floor walls. We got a little bit of rain today, so I'm not sure if that slowed them down at all or not, but let the pictures speak for themselves, quite a bit got done.


The outside of the front guest bedroom we will use as an office.


Walking around the right side here and looking back.

The back of the house.

The back corner looking up at the dining area.

A closeup of our walkout pit.

The living room wall with openings on left and right for windows. Center opening is where the fireplace will be.


Standing in the Kitchen, looking into the dining room.


And back in the dining room looking back to the kitchen.

In the kitchen next to the garage door, looking into the pantry (and the laundry room beyond)

And, again, the front of the house as it sits today:

Check back again tomorrow night for framing part 4!