Monday, September 20, 2010

Plumbing and HVAC started (9-20-10)

Like the title says, the plumbing and HVAC have started being roughed-in. The house is also now fully shingled, so hopefully weather won't cause any more delays.

Also, we had the electrical walk-through last Friday. Everything went extremely well! A few of the "extra's" we are having installed are receptacles high on the walls for flat-panel tv's, switched receptacles on the plant shelves for rope lights/christmas lights, 4 recessed cans in the kitchen, 4 recessed cans on the exterior, a switched receptacle in one of the eaves of the front from christmas lights, a ceiling fan for the deck, and undercabinet lighting in the kitchen!

Starting with the master bath:


Shower in master bath


Hall bath shower


Water distribution manifold


Sump Pump installed


Furnace in place


Main HVAC trunk


I love open webbed joists...no soffits for ductwork needed at all...


Our walkout pit slab poured!




Fireplace installed.


Siding started


Our address posted, update your address books!



And finally, we have a sold sign!!



The HVAC contractor should be finishing up tomorrow and Wednesday. Then, the Electrical contractor can begin work. I'm hoping I can get in on Sunday and run all of my low voltage wire....


Well, that's all for today, leave us some comments and let us know your reading this! Also, check back later this week, I'll probably make another update Wednesday.

3 comments:

  1. I'm reading it!!! :) Looks great!!!

    ReplyDelete
  2. A lot of progress lately. Taking on some Walbridge touches at long last!

    ReplyDelete
  3. 600 feet of speaker cable....2000 feet of cat 6?....how many Ethernet outlets do you need? What is this Circuit City?

    ReplyDelete