Also, we had the electrical walk-through last Friday. Everything went extremely well! A few of the "extra's" we are having installed are receptacles high on the walls for flat-panel tv's, switched receptacles on the plant shelves for rope lights/christmas lights, 4 recessed cans in the kitchen, 4 recessed cans on the exterior, a switched receptacle in one of the eaves of the front from christmas lights, a ceiling fan for the deck, and undercabinet lighting in the kitchen!
Starting with the master bath:
Shower in master bath
Hall bath shower
Water distribution manifold
Sump Pump installed
Furnace in place
Main HVAC trunk
I love open webbed joists...no soffits for ductwork needed at all...
Our walkout pit slab poured!
Fireplace installed.
Siding started
Our address posted, update your address books!
And finally, we have a sold sign!!
The HVAC contractor should be finishing up tomorrow and Wednesday. Then, the Electrical contractor can begin work. I'm hoping I can get in on Sunday and run all of my low voltage wire....
Well, that's all for today, leave us some comments and let us know your reading this! Also, check back later this week, I'll probably make another update Wednesday.
I'm reading it!!! :) Looks great!!!
ReplyDeleteA lot of progress lately. Taking on some Walbridge touches at long last!
ReplyDelete600 feet of speaker cable....2000 feet of cat 6?....how many Ethernet outlets do you need? What is this Circuit City?
ReplyDelete